California › Saratoga

What an ADU costs in Saratoga

Updated November 22, 2026. Every number below links to the public document it comes from.

Short answer: the Santa Clara County ADU program suggests $400 to $550 per square foot, design and fees included; we found no Saratoga-specific builder prices. Saratoga's building fees are based on the project's value, with plan check at 66% of the permit fee. Where the West Valley Sanitation District serves, the sewer fee for an ADU can reach about $8,100. A surveyor's site plan is required, and about a third of the city is in the wildfire zone. Saratoga issued 119 ADU permits in 2025, its most since at least 2018.

City and sewer fees for an ADU

From the City's fee schedule (effective July 1, 2026):

  • Building permit: set from the project's valuation, built from national construction cost data with a local multiplier ("A building valuation modifier of 2.9 shall be used"). At $100,001 of value the permit fee is $1,693, plus $9.60 for each additional $1,000 up to $500,000.
  • Plan check: 66% of the building permit fee.
  • Impact fees: "Accessory dwelling units up to seven hundred fifty square feet are exempt from impact fees" (City ADU page). Above that, state law allows only a share proportional to the main house. For scale, Saratoga's park development fee for a new single-family home is $56,845; the schedule doesn't say how it applies to larger ADUs, so ask before designing above 750 sq ft.
  • Fee waiver: all planning, building and engineering fees are waived for "Accessory Dwelling Units (ADUs) or Junior ADUs that are deed restricted" to below-market rent (appendix 1 of the schedule). This is not a general ADU fee waiver.
  • Sewer: the West Valley Sanitation District, which serves part of Saratoga, charges an ADU a connection fee based on its plumbing fixtures, up to about $8,100, and says its permits can take "up to ten to fifteen business days".
  • School fees apply to ADUs over 500 sq ft; we found no published rate for the districts serving Saratoga (the state maximum is $5.38 per sq ft).

Local rules that change the cost

  • More units than most cities: a single-family lot can have "One attached ADU and two attached JADUs and one detached ADU" (City ADU page).
  • Size and height: a detached ADU can have a "Maximum 1,200 sq. ft. of living area, not including garage", and can be 16 ft tall inside the required setbacks. "If you plan on constructing an ADU with a height of over 18 feet", design review is needed (City handout).
  • Parking: "One off-street uncovered parking space is required" unless an exemption applies. "There is no owner occupancy requirements for ADUs."
  • Survey and soils: the site plan must be "signed/stamped by a California Licensed Land Surveyor" (submittal checklist), and new detached structures need a soils report: budget for both before design.
  • Wildfire zone: "About 1/3 of the City of Saratoga is within the Wildland-Urban" interface (City checklist), where new buildings must use ignition-resistant materials and methods, which adds cost.
  • State review: in a letter of December 5, 2025, the state housing department noted that the ADU ordinance Saratoga has on file with it "is from 2020" (HCD letter); where local rules conflict with state law, state law applies.

Pre-approved plans

Under state law "the City of Saratoga pre-approves plans for detached ADUs" (City checklist), but when we checked, the City's housing page said it "is developing an ADU plans gallery" and we found no list of plans, prices or review times. The countywide Santa Clara County ADU program is the place to watch.

ADU permits in Saratoga

Saratoga issued 119 ADU building permits in 2025, up from 74 in 2024, and 470 from 2018 through 2025. The City has reported completed ADUs to the state only once (for 2019), so the completions column is not a real count.

ADUs in Saratoga: building permits issued and units completed, by year
YearADU permits issuedADUs completed
201816not reported
2019244
202043not reported
202166not reported
202246not reported
202382not reported
202474not reported
2025119not reported

Source: California Department of Housing and Community Development (HCD), Annual Progress Report data, Table A2 (data.ca.gov, updated November 20, 2026), as reported by the City of Saratoga. Units counted by the date on the building permit or certificate of occupancy, each project once; junior ADUs included. How we count.

Published prices for the area

  • The Santa Clara County ADU program's budget page gives "$400-550 per square foot" as a rough figure including design and fees, up to "$400,000+" for a large hillside ADU, which describes many Saratoga lots.
  • Builders' Bay Area figures: Abodu $300,000 to $500,000; Maxable from about $500 per sq ft. These are the companies' own figures; we don't recommend any of them.

Planning an ADU in Saratoga?

Tell us about your project. If we can match you with a builder who holds a current California licence, we will email you and ask before passing your details on. No promise of a match or a reply time.

Request builder quotes

Sources

  1. Adopted fee schedule, effective July 1, 2026 City of Saratoga
  2. Accessory dwelling units, ADU and JADU handout (August 2024), ADU submittal checklist, pre-approved ADU checklist, housing, design review checklist City of Saratoga
  3. Permit application information West Valley Sanitation District (hosted by the Town of Los Gatos)
  4. Letter of technical assistance California Department of Housing and Community Development, December 5, 2025
  5. Budget Santa Clara County ADU program
  6. Annual Progress Report data, Table A2 HCD on data.ca.gov, updated November 20, 2026
  7. Abodu 2026 cost guide, Maxable Builders' own figures