California › Sacramento

What an ADU costs in Sacramento

Updated November 22, 2026. Every number below links to the public document it comes from.

Short answer: the City of Sacramento's own fee estimate puts city fees for a new ADU at $5,271.90 at 749 sq ft but $10,624.40 at 750 sq ft, because the City's impact fees start at 750 sq ft; school and sewer fees come on top. The City gives away three permit-ready plans (367 to 747 sq ft). Builders publish $165,000 and up for a detached ADU in the Sacramento region, and about $95,000 and up for a garage conversion. The City issued 388 ADU permits in 2025, the most in Sacramento County.

City fees for an ADU

The City publishes a worked fee estimate for a new ADU (form CDD-0419, revised 07-12-2026). It shows what happens at 750 square feet, where the City starts charging impact fees. (State law exempts ADUs of 750 sq ft or less; the City's own sheet waives them only up to 749 sq ft.)

City of Sacramento fee estimate for a new ADU, by size
ADU sizeEstimated city fees
749 sq ft$5,271.90
750 sq ft$10,624.40
1,200 sq ft$14,842.50

Most of the jump at 750 sq ft is three fees that are not charged below it: the park impact fee ($2,617.50), the regional flood-control (SAFCA) fee ($1,575.00) and the transportation (STA) fee ($1,154.64). The City's ADU Resource Center says "if the ADU is equal to or less than 749 square feet, the development impact fees are waived". In other words, keeping an ADU at 749 sq ft saves about $5,350 in city fees.

Not in the estimate:

  • School fees, paid to the school district on ADUs over 500 sq ft. The City's school fee sheet (revised 09-09-2026) lists $5.38 per sq ft for Sacramento City Unified, the state maximum.
  • Sewer fees from the regional sewer district (SacSewer). The City's sheet says to check with the county; we could not read SacSewer's site, so we give no figure.
  • A water meter: "ADUs generally do not require a separate water meter" (fee estimate CDD-0419), but "Detached ADUs can have a separate domestic water service and meter" (ADU Resource Center), which costs extra.
  • Stormwater: if the project adds more than 500 sq ft of paved or roofed area, stormwater mitigation is required (same page).

The City also has a program that reduces impact fees by up to $10,000 per unit for homes kept affordable by a 30-year deed restriction (City of Sacramento); it is not limited to ADUs.

Free and pre-approved plans

Sacramento gives away three all-electric detached ADU plan sets (Shelf Ready Plans): a studio (367 habitable sq ft), a one-bedroom (559) and a two-bedroom (747). You add a site plan for your lot; "Modifications to the Shelf Ready Plans are not allowed" other than mirroring. All three are under 750 sq ft, so they stay below the impact fee line. Separately, the City runs the state-required pre-approved ADU program for designers' own plans; when we checked, no plans were listed yet.

How long the permit takes

The City's submittal guide says building plan review takes "Roughly 1.5-2 months": 20 business days for the first review, then shorter rounds (15 and then 5 business days) if corrections are needed. An optional zoning review before you apply is free and takes one to three weeks, and "A new address can take up to four weeks to receive." State law caps the decision at 60 days once the application is complete.

Local rules that change the cost

  • Two sets of standards. Sacramento lets owners build a detached ADU under the City's own standards ("Maximum of 1,200 square feet in combined total", with the zone's height limit, 35 ft in the R-1 zone) or under the state's standards: "Property owners must choose one set of standards for the ADU(s) on their lot" (Step 1 guide).
  • State review. In a letter dated August 18, 2026, the state housing department found the City's ADU ordinance (Ordinance No. 2026-0001) still out of line with state law, including the choose-one-set rule and the standards for historic districts (HCD letter). Expect these rules to change.
  • Historic districts. "There are 31 historic districts within the City", with extra design review for ADUs there.

ADU permits in Sacramento

The City of Sacramento issued 388 ADU building permits in 2025, about nine times the 41 of 2018, and ranked 9 among California cities and counties.

ADUs in Sacramento: building permits issued and units completed, by year
YearADU permits issuedADUs completed
20184123
20195739
20207620
202125289
2022261139
2023302190
2024348288
2025388264

Source: California Department of Housing and Community Development (HCD), Annual Progress Report data, Table A2 (data.ca.gov, updated November 20, 2026), as reported by the City of Sacramento. Units counted by the date on the building permit or certificate of occupancy, each project once; junior ADUs included. How we count.

Builder prices published for Sacramento

These are companies' own published figures, not quotes, and we do not recommend any of them.

  • Upside ADU (June 2026): detached $165,000 and up at $250 to $360 per sq ft; garage conversions from about $95,000; junior ADUs from about $85,000; attached ADUs $150,000 to $289,000.
  • Block Renovation (2026): "around $180,000 to $260,000" for a 600 sq ft detached ADU with mid-range finishes.
  • Abodu (March 2026): $150,000 to $250,000 for the Central Valley.

Planning an ADU in Sacramento?

Tell us about your project. If we can match you with a builder who holds a current California licence, we will email you and ask before passing your details on. No promise of a match or a reply time.

Request builder quotes

Sources

  1. CDD-0419 Accessory Dwelling Unit fee estimate City of Sacramento, revised 07-12-2026
  2. CDD-0226 School district impact fees City of Sacramento, revised 09-09-2026
  3. ADU Resource Center: shelf ready plans, application submittal, step 1, utilities City of Sacramento
  4. ADU ordinance findings letter California Department of Housing and Community Development, August 18, 2026
  5. Annual Progress Report data, Table A2 HCD on data.ca.gov, updated November 20, 2026