What an ADU costs in San Diego

Updated November 22, 2026. Every number below links to the public document it comes from.

Short answer: a San Diego builder publishes $300,000 to $450,000+ all-in for a new detached ADU, and a 2021 city housing pilot built five ADUs for $116,803 to $342,078 (before some site work). The City charges no impact fees on the first two ADUs on a lot, whatever their size, but every ADU permit pays plan check and inspection fees (from $3,512.92 plus $2,228.29 for a small detached unit) and a $737 General Plan Maintenance Fee. San Diego issued 2,165 ADU permits in 2025, second only to Los Angeles.

City fees for an ADU

Base building fees from the City's fee bulletin (Information Bulletin 501, August 2026); per-square-foot additions can apply on top:

City of San Diego base building fees for an ADU (August 2026)
ADUPlan check baseInspection base
Detached, up to 500 sq ft$3,512.92$2,228.29
Detached, over 500 sq ft$8,085.26$8,401.90
  • General Plan Maintenance Fee: $737.00, charged once per permit; the City's ADU bulletin (IB 400) says it "applies to all ADU and" JADU permits, whatever their size.
  • Impact fees: the Municipal Code (§142.0640) exempts ADUs under 750 sq ft and junior ADUs, and goes further than state law: "The first two Accessory Dwelling Units on a premises shall be" exempt regardless of size (except ADUs built under the SB 9 lot-split rules), and any ADU is exempt if the owner lives on the property for three years from the permit date. Projects with more than one ADU pay the regional transportation fee (RTCIP).
  • School fees: San Diego Unified charges $5.38 per sq ft (from May 10, 2026); ADUs adding less than 500 sq ft are exempt (IB 146).
  • A separate water meter brings the San Diego County Water Authority's capacity charges: $6,501 plus $182 for a meter under 1 inch in 2026, and $5,373 plus $244 from January 1, 2027. Without a new meter these don't apply.
  • Altogether: SnapADU, a local builder, says permit fees run "up to $26-28/sqft in the City of San Diego", well above nearby Chula Vista and Encinitas (SnapADU, a vendor figure). We found no current City figure for water and sewer capacity charges on an ADU.

Pre-approved plans

The City accepts the County of San Diego's standard ADU plans (and Chula Vista's and Encinitas's); using them is "subject to a 30-day review" (City ADU page). The County's plans run from a 600 sq ft one-bedroom to a 1,200 sq ft three-bedroom and are "approximately 85% complete": you or a designer fill in the site details.

Local rules that change the cost

  • ADUs can be 150 to 1,200 sq ft. "In Single Dwelling Unit Zones, ADUs shall not exceed two stories."
  • In a Very High Fire Hazard Severity Zone the ADU needs a "minimum 4-foot Side and Rear Yard Setback", and SnapADU notes that small placement choices near lot lines or far from the curb can trigger fire-rated walls or sprinklers costing about $10,000 or more each.
  • No short-term rentals: an ADU or JADU can't be rented for a "rental term of less than 31 consecutive days". "The property owner is not required to live on-site."
  • Bonus ADUs were cut back. In June 2025 the City Council capped extra ADUs under its bonus program, for example at "four ADUs for lots that are 8,000 square feet or less" (KPBS). In October 2025 the state housing department wrote that "HCD finds that the Ordinance fails to comply with" state ADU law (HCD letter); we found no later fix.
  • Legalizing an old unit: ADUs "constructed without a building permit prior to January 1, 2020" can be legalized, and "No water and sewer capacity fees will apply" (IB 242).

ADU permits in San Diego

The City of San Diego issued 2,165 ADU building permits in 2025, the second most in California after the City of Los Angeles, and 9,225 from 2018 through 2025. The completions the City reported for 2025 fell sharply from 2024; that may be a reporting change rather than fewer finished units.

ADUs in San Diego: building permits issued and units completed, by year
YearADU permits issuedADUs completed
201821677
2019627169
2020491257
2021870327
2022666484
20231,909779
20242,281851
20252,165229

Source: California Department of Housing and Community Development (HCD), Annual Progress Report data, Table A2 (data.ca.gov, updated November 20, 2026), as reported by the City of San Diego. Units counted by the date on the building permit or certificate of occupancy, each project once; junior ADUs included. How we count.

What ADUs cost in San Diego

  • Public cost study: the San Diego Housing Commission's 2021 ADU pilot built five ADUs for $116,803 to $342,078 each, with city permits and fees of $3,585 to $14,509; the totals leave out some costs such as new utility connections and grading. It advised a "contingency reserve of closer to 20 percent". Costs have risen since 2021.
  • Builder figures: SnapADU (November 2026) publishes $300,000 to $450,000+ all-in for a detached ADU, $375 to $600+ per sq ft; Abodu gives $225,000 to $375,000 for San Diego County; Maxable says costs start at about $350 per sq ft. These are the companies' own figures; we don't recommend any of them.
  • Time: SnapADU says detached ADUs in San Diego "routinely take 12 to 24 months from concept to completion".

Planning an ADU in San Diego?

Tell us about your project. If we can match you with a builder who holds a current California licence, we will email you and ask before passing your details on. No promise of a match or a reply time.

Request builder quotes

Sources

  1. Information Bulletin 501: fee schedule for construction permits City of San Diego, August 2026
  2. IB 400: ADU and JADU, IB 146: school fees, IB 242: legalizing unpermitted ADUs, ADU program page City of San Diego Development Services
  3. Municipal Code chapter 14, article 2, division 6 City of San Diego, July 2026
  4. Developer fees San Diego Unified School District
  5. Capacity charges San Diego County Water Authority
  6. Dwelling unit building plans County of San Diego
  7. ADU ordinance findings letter California Department of Housing and Community Development, October 6, 2025
  8. San Diego City Council approves rollback of ADU incentives KPBS, June 17, 2025
  9. ADU pilot program report San Diego Housing Commission, October 2021
  10. Annual Progress Report data, Table A2 HCD on data.ca.gov, updated November 20, 2026
  11. SnapADU cost page and detached ADU report, Abodu 2026 cost guide, Maxable Builders' own figures