Updated November 22, 2026. Every number below links to the public document it comes from.

Short answer: Cupertino charges flat ADU building fees: $2,795 plan check plus $2,975 inspection for an ADU up to 499 sq ft, and $4,058 plus $4,164 for 500 to 999 sq ft (FY 2026-27), plus a 5.8% technology fee. Above 500 sq ft two school districts add $3.23 and $2.15 per sq ft; at 750 sq ft and up a park fee applies. The Santa Clara County ADU program suggests $400 to $550 per sq ft all-in. Cupertino issued 59 ADU permits in 2025.

City and district fees for an ADU

Building fees from the City's FY 2026-27 building fee schedule (Resolution 26-047, effective July 1, 2026):

Cupertino ADU building fees (FY 2026-27)
FeeADU up to 499 sq ft500 to 999 sq ft
Plan check$2,795$4,058
Inspection$2,975$4,164
Together$5,770$8,222

"Together" is our sum of the two fees, before the 5.8% technology fee.

  • Park fee: the City's engineering fee schedule charges an "ADU 750 SF or more" a park fee of $15,000 or a share set "proportionally to the size of the main dwelling unit", whichever is less. ADUs under 750 sq ft "will not incur City impact fees such as park or storm drain impact fees" (City FAQ).
  • School fees on ADUs over 500 sq ft go to two districts: Cupertino Union charges $3.23 per sq ft (effective May 13, 2026) and Fremont Union High $2.15 per sq ft (from May 9, 2026). Some City pages say ADUs under 750 sq ft pay no school fees; the districts' own rules start at 500 sq ft, so check with them.
  • Sewer: Cupertino Sanitary District charges "$600.00 per new connection", and "These fees are separate from the City permit fees" (district page).

Pre-approved plans, but only on the valley floor

Cupertino's pre-approved ADU plans offer the "fastest, lowest-cost permit process", but "This preapproval program applies only to detached ADUs", and only on parcels in the Valley Floor Zone, because much of the city lies in "geologic and seismic hazard areas". The listed plans run from a "476 sq. ft. 1 bedroom and 1 bathroom ADU" to a 991 sq ft two-bedroom. Hillside lots need custom plans, usually with geotechnical work.

How long the permit takes

The City's Building permits page gives a 10-day target for ADU reviews but says reviews currently average "20-30 business days for the initial plan review" and "10-20 business days for each subsequent review". State law caps the decision at 60 days once the application is complete.

Local rules that change the cost

  • On single-family lots, for a studio or one-bedroom ADU "the maximum size allowable is 850 sq. ft."; with two or more bedrooms, "the maximum allowable size is 1,000 sq. ft." (City FAQ).
  • ADUs of 800 sq ft or less "are not limited by lot coverage, FAR, and open space requirements" and can be "located as close at 4 ft from the rear and side property lines" (City ADU page).
  • State review: on April 24, 2025, the state housing department found that Cupertino's ADU ordinance (Ordinance No. 23-2254) "fails to comply with" state ADU law on several points (HCD letter). We could not confirm whether the City has amended it since; where local rules conflict with state law, state law applies.

ADU permits in Cupertino

Cupertino issued 59 ADU building permits in 2025, its most in any year since 2018, and 240 from 2018 through 2025.

ADUs in Cupertino: building permits issued and units completed, by year
YearADU permits issuedADUs completed
2018150
2019150
2020190
20214115
20223033
20231743
20244448
20255948

Source: California Department of Housing and Community Development (HCD), Annual Progress Report data, Table A2 (data.ca.gov, updated November 20, 2026), as reported by the City of Cupertino. Units counted by the date on the building permit or certificate of occupancy, each project once; junior ADUs included. How we count.

Published prices for the area

  • The Santa Clara County ADU program's budget page gives "$400-550 per square foot" as a rough figure including design and fees, from "$30,000 for a simple interior conversion JADU" upward.
  • Builders' Bay Area figures: Abodu $300,000 to $500,000; Maxable from about $500 per sq ft. These are the companies' own figures; we don't recommend any of them.
  • We found no builder price published for Cupertino specifically.

Planning an ADU in Cupertino?

Tell us about your project. If we can match you with a builder who holds a current California licence, we will email you and ask before passing your details on. No promise of a match or a reply time.

Request builder quotes

Sources

  1. Building fee schedule and engineering fee schedule City of Cupertino, FY 2026-27
  2. Accessory dwelling units, ADU FAQ, pre-approved ADU plans, building permits City of Cupertino
  3. ADU ordinance findings letter California Department of Housing and Community Development, April 24, 2025
  4. Developer fees Cupertino Union School District; Business services Fremont Union High School District
  5. Sewer permits and fees Cupertino Sanitary District
  6. Budget Santa Clara County ADU program
  7. Annual Progress Report data, Table A2 HCD on data.ca.gov, updated November 20, 2026
  8. Abodu 2026 cost guide, Maxable Builders' own figures