California › Santa Clara

What an ADU costs in Santa Clara

Updated November 22, 2026. Every number below links to the public document it comes from.

Short answer: the Santa Clara County ADU program suggests $400 to $550 per square foot, design and fees included, so roughly $240,000 to $330,000 for a 600 sq ft unit at those rates. The City of Santa Clara's own ADU charges in its FY 2026/27 fee schedule include a $306 planning fee, a $747 wastewater capacity fee and building fees that grow with size; school fees of $5.38 per sq ft apply above 500 sq ft. The City's pre-approved plans get a first review within 10 business days. Santa Clara issued 140 ADU permits in 2025, up from 55 in 2024.

City fees for an ADU

From the City's FY 2026/27 Municipal Fee Schedule (adopted April 21, 2026, in effect from July 1, 2026):

City of Santa Clara charges for an ADU (FY 2026/27)
FeeAmount
Planning fee, ADU or junior ADU$306.00
Building plan review$732.00 for the first 250 sq ft, plus $292.80 per additional 100 sq ft up to 1,000 sq ft (less above that)
Building permit$812.00 for the first 250 sq ft, plus $249.50 per additional 100 sq ft up to 1,000 sq ft (less above that)
Technology fee3.37% of the building fees
Wastewater treatment capacity fee$747.00 per ADU ($1,187.00 for a regular home)
Sewer conveyance fee$1.14 per sq ft, only for ADUs of 750 sq ft and larger

Of these, only the sewer conveyance fee carries the schedule's note "Per AB 68, a fee cannot be charged for an accessory dwelling unit of less than 750 square feet"; the building, planning and wastewater capacity rows carry no such note. Ask the City whether the $747 capacity fee applies to a small ADU; state law bars capacity fees on conversions inside an existing building and on junior ADUs (state rules). We could not confirm how the City's park and traffic impact fees apply to larger ADUs, so we leave them out rather than guess; ask the City before you design above 750 sq ft.

  • School fees: Santa Clara Unified charges $5.38 per sq ft for homes "Beginning August 24, 2026", with nothing due on ADUs "or additions to existing residential units under 500 square feet" (SCUSD). Parts of the city are in the Cupertino and Fremont Union districts, which charge their own rates (see our Cupertino guide).
  • Electricity: Santa Clara has its own utility, Silicon Valley Power. We found no ADU-specific connection fee or meter rule from it.

Pre-approved plans

The City runs its own Pre-Approved ADU Plans program. It promises a review "within 10 business days of the City receiving required fee payment" and "five business days for subsequent rounds", with no extra fee for the faster review (expedited review page). The approved plans listed include a "1 story, 499 sf, 1 bed, 1 bathroom" site-built unit and a "1 story, 660 sf, 2 bed, 1 bathroom" prefab unit. The program is not available if the lot is in a flood zone (A, AE, AH or AO) or on a historic property.

How long the permit takes

For ordinary (not pre-approved) plans, the City's plan review page gives target times of 10 business days for a first review of minor projects and 20 for standard ones, with shorter rounds after that; it doesn't say which group a custom ADU falls in. The county ADU program says "Most ADU projects take 12-18 months to complete" (aduscc.org), design to move-in.

Local rules that change the cost

From the City's ADU handout (Rev. 01/26):

  • A detached ADU can be up to 1,000 sq ft on lots of 5,500 sq ft or less, and up to 1,200 sq ft on larger lots.
  • Height: "Maximum 18 feet for single story" and "Maximum 25 feet for 1.5 stories".
  • "No parking required for an ADU or JADU", which avoids the cost of a new parking space.
  • ADUs and junior ADUs can't be rented for 30 days or less.

ADU permits in Santa Clara

The City of Santa Clara issued 140 ADU building permits in 2025, the second most in Santa Clara County after San Jose, after hovering around 50 to 75 a year since 2019.

ADUs in Santa Clara: building permits issued and units completed, by year
YearADU permits issuedADUs completed
20182117
20195137
20204533
20215354
20227646
20235458
20245562
202514070

Source: California Department of Housing and Community Development (HCD), Annual Progress Report data, Table A2 (data.ca.gov, updated November 20, 2026), as reported by the City of Santa Clara. Units counted by the date on the building permit or certificate of occupancy, each project once; junior ADUs included. How we count.

Published prices for the area

  • The Santa Clara County ADU program's budget page gives "$400-550 per square foot" as a rough figure including design and fees, and a range from "$30,000 for a simple interior conversion JADU" to "$400,000+ for a large detached ADU".
  • Builders' Bay Area figures: Abodu $300,000 to $500,000; Maxable from about $500 per sq ft. These are the companies' own figures; we don't recommend any of them.
  • We found no builder price published for the City of Santa Clara specifically.

Planning an ADU in Santa Clara?

Tell us about your project. If we can match you with a builder who holds a current California licence, we will email you and ask before passing your details on. No promise of a match or a reply time.

Request builder quotes

Sources

  1. FY 2026/27 Municipal Fee Schedule City of Santa Clara, adopted April 21, 2026
  2. Accessory Dwelling Unit handout City of Santa Clara Planning, Rev. 01/26
  3. Pre-approved ADU plans, expedited plan review, plan review City of Santa Clara Building Division
  4. Developer fees Santa Clara Unified School District
  5. Budget Santa Clara County ADU program
  6. Annual Progress Report data, Table A2 HCD on data.ca.gov, updated November 20, 2026
  7. Abodu 2026 cost guide, Maxable Builders' own figures