California › San Jose

What an ADU costs in San Jose

Updated November 22, 2026. Every number below links to the public document it comes from.

Short answer: the City of San José's building fees for a new ADU up to 750 sq ft are $3,291 ($422 permit issuance, $1,137 plan review, $1,732 inspection; FY 2026-27), and $5,103 from 751 to 1,200 sq ft, plus construction taxes based on the project's value. One vendor lists a 749 sq ft model from the City's pre-approved plans at $349,000; the Santa Clara County ADU program suggests $400 to $550 per sq ft all-in. San José issued 502 ADU permits in 2025, the most in the Bay Area.

City fees for an ADU

From the City's FY 2026-27 Building Division fee schedule (effective August 10, 2026):

San José building fees for a new ADU (FY 2026-27)
FeeADU up to 750 sq ft751 to 1,200 sq ft
Permit issuance$422$633
Plan review$1,137$1,950
Inspection$1,732$2,520
Together$3,291$5,103

"Together" is our sum. "Modular fees are 10% lower for plan review and 20% lower for inspections."

  • Construction taxes are collected when the permit is issued, as a share of the building's valuation: residential rates of 2.42% and 1.54%, plus smaller per-unit taxes (same schedule). The City's fee estimator gives a total for a specific project.
  • School and park fees: the City says "school impact fees do not apply to ADUs less than 750 sq. ft." and the same for parkland fees (City ADU fees page). School districts set their own rules, though: East Side Union High School District says ADUs under 750 sq ft are not exempt from its $1.36 per sq ft fee, including garage conversions (ESUHSD). Check with the districts for your address. Park fees for ADUs of 750 sq ft or more run from $1,700 to $8,900 depending on the area, on a City map based on 2017/2018 fee levels.
  • Electric meter: "PG&E requires all ADUs to have their own PG&E utility meter"; junior ADUs don't need one (City ADU FAQs).
  • Fire access: the City's ADU checklist asks whether the ADU is within 600 ft of a fire hydrant (if not, "you may need a Fire Variance that entails additional safety measures") and whether the hydrant delivers 1,000 gpm at 20 psi. If the main house has fire sprinklers, "the ADU must also have a fire sprinkler system" (Bulletin #210).

Pre-approved plans and same-day permits

San José keeps a list of pre-approved ADU plans from private vendors. With one of them, "permits may be issued on the same day of the scheduled plan review meeting" if the site plan and documents are complete. The lot "must NOT be located in a geohazard zone, landslide zone, flood zone or Wildland-Urban Interface (WUI) area".

How long the permit takes

"It typically takes 20 business days to go through the first round of building review" (City ADU FAQs) for custom plans. A preliminary meeting with a planner is billed at $398 an hour, with a 30-minute minimum (ADU process page).

Local rules that change the cost

  • Two sets of standards: "Design the ADU following either City Standards ... or State Standards ... The standards cannot be mixed" (Bulletin #210). Under City standards a detached ADU can be 1,000 sq ft on lots under 9,000 sq ft and 1,200 sq ft on larger lots.
  • State review: the state housing department wrote in December 2025 that the ADU ordinance it has on file for San José "is from 2021" and "may be outdated and out of compliance" (HCD letter). Where local rules conflict with state law, state law applies.

ADU permits in San José

San José issued 502 ADU building permits in 2025, the fifth most in California and the most of any Bay Area city, and 3,337 from 2018 through 2025.

ADUs in San Jose: building permits issued and units completed, by year
YearADU permits issuedADUs completed
201819269
2019416136
2020331237
2021420291
2022448312
2023470334
2024558365
2025502360

Source: California Department of Housing and Community Development (HCD), Annual Progress Report data, Table A2 (data.ca.gov, updated November 20, 2026), as reported by the City of San Jose. Units counted by the date on the building permit or certificate of occupancy, each project once; junior ADUs included. How we count.

Published prices for San José

  • Acsiom Designs lists its 749 sq ft, two-bedroom model, which is on the City's pre-approved list, at a "Standard MSRP" of $349,000 including up to $30,000 of foundation work.
  • The Santa Clara County ADU program's budget page gives "$400-550 per square foot" as a rough figure including design and fees.
  • Builders' Bay Area figures: Abodu $300,000 to $500,000; Maxable from about $500 per sq ft. These are the companies' own figures; we don't recommend any of them.

Planning an ADU in San José?

Tell us about your project. If we can match you with a builder who holds a current California licence, we will email you and ask before passing your details on. No promise of a match or a reply time.

Request builder quotes

Sources

  1. Building and structure permits fee schedule City of San José, effective August 10, 2026
  2. Fees for ADUs, preapproved ADUs, ADU FAQs, ADU project process, Bulletin #210 ADU universal checklist, parkland impact fees for ADUs City of San José
  3. Developer fees East Side Union High School District
  4. Letter of technical assistance California Department of Housing and Community Development, December 10, 2025
  5. Budget Santa Clara County ADU program
  6. Annual Progress Report data, Table A2 HCD on data.ca.gov, updated November 20, 2026
  7. Acsiom Designs, Abodu 2026 cost guide, Maxable Builders' own figures