What an ADU costs in San Mateo

Updated November 22, 2026. Every number below links to the public document it comes from.

Short answer: the City of San Mateo charges a flat $2,831.57 permit fee for a new ADU, $2,031.12 for a conversion and $1,454.02 for a junior ADU; with a pre-approved, prefab or manufactured design it is $1,455.43 (FY 2026-27). A detached ADU that needs its own sewer connection may also pay $5.87 per sq ft. San Mateo County's ADU Resource Center suggests $450 to $600 per sq ft all-in. San Mateo issued 94 ADU permits in 2025, the most in San Mateo County.

City fees for an ADU

From the City's adopted fee schedule for July 1, 2026 to June 30, 2027 (the same amounts as the year before) and its ADU page:

City of San Mateo flat ADU permit fees (FY 2026-27)
Kind of unitFee
New ADU$2,831.57
Conversion or remodel ADU$2,031.12
Junior ADU$1,454.02
Pre-approved, prefab or manufactured ADU$1,455.43
  • Sewer: the wastewater capacity charge for an ADU is $5.87 per sq ft (development fees summary, revised July 1, 2026). The City's ADU handout says a new connection "may be subject to a connection fee or capacity charges based on ADU size or number of fixtures", so it mainly concerns detached ADUs with their own line.
  • Impact fees: none on an ADU of 750 sq ft or less under state law. The handout lists "School District Developer Impact" fees separately: school districts charge on ADUs over 500 sq ft (state maximum $5.38 per sq ft); we found no current rate for the San Mateo districts.

Pre-approved plans

The City's pre-approved ADU plans guide offers designs "with a reduced permit" fee ($1,455.43), about half the regular new-ADU fee, in exchange for not changing the design.

How long the permit takes

The approval of a compliant ADU "is ministerial" (no hearing). The City's building FAQ says "Allow up to 20 working days for review" for each plan check, and the county Resource Center says "it will take one to six months to get permits" (smcadu.org).

Local rules that change the cost

  • New rules in 2026: San Mateo's ADU rules were "updated effective March 4, 2026", after the state housing department wrote on October 18, 2024 that "HCD finds that the Ordinance does not comply with State ADU" law (HCD findings).
  • Size and height: detached ADUs can reach "18 feet to top plateline and 24 feet to roof peak"; "Up to 800 square feet of" ADU space doesn't count against the lot's floor-area limit; setbacks are a "Minimum of four feet from side and rear lot lines".
  • Parking: "No off-street parking is required for any ADU or JADU."
  • Survey: the City "requires homeowners to complete a brief" ADU survey, including expected rent, before the permit is issued (survey form).
  • Old unpermitted units "built without permits before January 1, 2020" can be legalized, and "Applicants cannot be required to pay impact fees or connection or capacity charges" (City handout).

ADU permits in San Mateo

The City of San Mateo issued 94 ADU building permits in 2025, the most of any city in San Mateo County, and 519 from 2018 through 2025.

ADUs in San Mateo: building permits issued and units completed, by year
YearADU permits issuedADUs completed
201887
20194621
20205935
20217752
20228351
20238664
20246643
20259468

Source: California Department of Housing and Community Development (HCD), Annual Progress Report data, Table A2 (data.ca.gov, updated November 20, 2026), as reported by the City of San Mateo. Units counted by the date on the building permit or certificate of occupancy, each project once; junior ADUs included. How we count.

Published prices for the area

  • The San Mateo County ADU Resource Center gives "$450-$600 per square foot" as a rough all-in figure, and says hard construction costs, typically about 85% of the budget, "can range from $30,000 for a simple interior conversion to $400,000+". It also offers San Mateo residents a "free one-hour personalized virtual consult".
  • Builders' Bay Area figures: Abodu $300,000 to $500,000; Maxable from about $500 per sq ft. These are the companies' own figures; we don't recommend any of them.
  • We found no builder price published for San Mateo specifically.

Planning an ADU in San Mateo?

Tell us about your project. If we can match you with a builder who holds a current California licence, we will email you and ask before passing your details on. No promise of a match or a reply time.

Request builder quotes

Sources

  1. Adopted comprehensive fee schedule, July 1, 2026 to June 30, 2027, development fees City of San Mateo
  2. Accessory dwelling unit, single-family ADU and JADU handout, pre-approved ADU plans guide, ADU/JADU survey, AB 2533 handout, building FAQ City of San Mateo
  3. ADU ordinance findings California Department of Housing and Community Development, October 18, 2024
  4. Budgeting and FAQs San Mateo County ADU Resource Center
  5. Annual Progress Report data, Table A2 HCD on data.ca.gov, updated November 20, 2026
  6. Abodu 2026 cost guide, Maxable Builders' own figures